GreenDev white logo

How to Apply and Get Approved for an Online Environmental Compliance Certificate (ECC) from the DENR

We’re giving you all you need to know about ECC’s– from its brief history and context, up to the complete requirements, costs and the step by step guide on how to apply for it and get your project approved.

At any point that you’d need professional assistance on compliance and application, you can always reach out to us by setting an initial appointment or sending us an email regarding your requirements.

Brief History and Context

On the 11th of June 1978, the Presidential Decree on “Establishing an Environmental Impact Statement System including other Environmental Management-Related Measures“ was released. It stated that “no person, partnership, or corporation shall undertake or operate any declared environmentally critical project or area without securing first an Environmental Compliance Certificate (ECC).”

More than two (2) decades later, the Malacañang Palace released Administrative Order #42, which mandates the Environmental Management Bureau (EMB) under the Department of Environment and Natural Resources (DENR) to accept, process and approve qualified ECC applications. Hence, all ECC applications are addressed to the EMB.

An approved ECC application means that your proposed undertaking poses no significant negative impact on the environment. Upon approval, you shall commit to fulfill the specific measures and conditions indicated in the ECC before and during the operation of the project, and even after the project completion.

An ECC also certifies that the proponent has complied with all the requirements of the Environmental Impact Statement (EIS) System and has committed to implement its approved environmental management plan.

In cases where DENR-EMB finds that an ECC is not applicable, a Certificate of Non-Coverage (CNC) shall be issued confirming that the proposed project is not part of the Environmental Impact Statement (EIS) and poses no environmental threat.

Frequently Asked Questions

as answered by the Environmental Compliance Assistance Center (ECAC)

Any LGU with proposed projects which has been declared as Environmentally Critical Projects (ECPs) or projects located in Environmentally Critical Areas (ECAs) which are presumed to have significant impacts on the environment.

  • Scanned copy of the deposit transaction slip and duly notarized IEE Checklist
  • Geo-tagged photographs of proposed project site
  • Maps of impact/affected areas (showing at least 1km from the project boundaries)
  • Certification from LGU proving the compatibility of proposed project with existing land use plan
  • Site development plan/vicinity map signed by registered professionals
  • Project/Plant layout signed by registered professionals
  • Schematic diagram of wastewater treatment facility (if applicable)
  • Schematic diagram of air pollution control facility (if applicable)
  • Organizational Chart in charge of environmental concerns
  • Proof of authority over the project site (e.g. land title, lease contract, deed of absolute sale, etc.)
  • Duly accomplished project environmental monitoring and audit prioritization scheme (PEMAPS)

If you’re using Mozilla Firefox, click Add Exception and then Confirm Security Exception. For Google Chrome, click Advanced Options and then Click Proceed.

You may refer to the Revised Guidelines for Coverage Screening and Standardized Requirements under PEISS (page 18 of PDF) as your guide.

The system only accepts numeric and period only. Comma and spaces are not allowed.

Total application fee is only PHP5,055.00

You may pay at any LandBank branch using the OnCall Payment Slip or at the EMB office where you are transacting

You may correspond with EMB RO through the Online System. Frequently check your account for updates or additional information needed to fully process your application. Additionally, you may call the EMB RO where your project is located.

All issued ECC can be validated online through the EMB Website.

Certified True Copies can be obtained from the concerned EMB Regional Office.

Given that you’ve submitted all the necessary requirements, it will take 20 working days for your application to be approved.

No. You have to apply online or set an appointment with them first. If you hire professionals to assist you, they can be the ones to set the appointment for you.

How to Apply for an ECC Online

Online Application Portal

Go to https://ecconline.emb.gov.ph/live

1

User guide and Registration

Following the steps outlined in the ECC Online user guide, fill out the registration form. (Click this area to download the guide)

2

ECC Application

Verify your project. Take note of the industry your project falls under.

3

IEE Checklist Form

Once qualified, fill out the online Initial Environmental Examination (IEE) Checklist form.

4

Order of Payment

After filling out the IEE Checklist form, download and print the Order of Payment. Go to any LandBank Branch nationwide and pay the processing fee of Php 5,055.00

5

Notarize

Have your accomplished IEE checklist with accountability statement of proponent notarized.

6

Upload Requirements

Submit and upload the necessary documents (See FAQs above)

7

Evaluation

The EMB Regional Office will evaluate the applications filed online. The evaluation could result to either an approval or a need to submit additional information. Check your ECC Online Account frequently.

8

The Verdict

After all the pertinent documents are passed, EMB RO may deny or approve the ECC Application/

9

Print Results

You may have your results printed from the EMB Online System or through your ECC Online account

10

If you want to save your team from the hassle of going through all of these, or if you need professionals to audit and ensure the compliance of your project, your friends at GreenDev would love to help.

Our Happy Clients are our Credentials

Petron
Boracay Water
Paragon Green Energy

20

Full-time Professionals

Group 10

50+

Projects Deployed

Group 11

Apply properly, get approved easily!